You are the one who has to say how many standards, how many ledgers and how many anchors before the truck leaves the yard. Get it wrong and the crew waits on site, or the scaffold gets built short. Drawing a facade scaffold in SketchUp bay by bay is a day of copying, and the first change to the building throws it all away.
ScaffoldFun is being built so that you select the building, answer a few plain questions and press "Build the scaffold": corners, levels, ladders, anchors, a simple load check and a bill of materials come out together.
How a facade scaffold is built from your SketchUp model
You can select the building, select wall faces, or draw the wall base. Rectangular, L, U and T plans, angled facades, chamfered corners, projections and recesses are handled, corners never overlap and narrow recesses are bridged. Each bay follows its own eave or gable height, the top deck stays within 1.5 m of the eave for roof-edge protection, and on sloping ground every standard gets an adjustable jack with extra lower lifts on the low side.

Systems, components and the master settings
- Two built-in generic systems, a modular rosette system and an H-frame system, calibrated from manufacturer catalogues; you can add your own system as a file.
- Standards, frames, jacks, sole boards sized to the load, ledgers, platforms and hatch platforms, toe boards, guardrails, diagonal braces, inside consoles, a top outside console, protection fans, nets and sheeting, a stair tower, earthing and a load sign.
- Anchors every 8 m staggered on an open facade, 4 m with netting and 2 m with sheeting; around windows and doors they shift to solid wall or move to the next standard line, and you are warned when one has to be placed by hand.
- Door passages bridged with lattice girders, inside-corner transitions with a walkable corner plate, and a material loading platform at mid or top level.
- Job presets for paint and plaster, masonry and heavy work, plus a "master settings" area for width, load class, bay length, lift height, decking frequency and more.

Load check, safety checklist and drawing
The standard load follows EN 12811-1, full load on the worst level and half on the next, with the base pressure checked against the soil. It also checks the 24 m height limit, headroom, access every 50 m and when a stair tower is needed. The safety checklist is based on EN 12811-1 and the Turkish construction health and safety regulation. The drawing is a printable A3 sheet with a title block, plan, an elevation per facade with levels, dimensions, anchors, braces, ladders and girders, plus warnings, checklist and the bill of materials, which also exports to CSV for Excel with spares and weights.

An erection animation for the site team
The scaffold can play its own erection sequence in 2 m bands, jack, standard, ledger, brace, platform, ladder, guardrail, anchor, with the camera turning around the building, saved as an MP4 in landscape or Reels format. The model itself is not changed.
What it is and is not
- It is a preliminary design and training tool: a real scaffold follows the manufacturer’s manual, and the calculation and erection plan must be approved by a qualified engineer.
- Some values, such as soil bearing values, are marked as unverified in the tool itself.
- There is no tube-and-coupler system yet and no third built-in system.
- It runs on SketchUp 2021 to 2026 on Windows; the manual test round is still open.
How do you model scaffolding in SketchUp?
By hand, you build one bay as a component and copy it along each facade, then add ladders, anchors and corners yourself and count everything at the end. A scaffolding plugin builds the bays from the building’s own outline and heights, so the count comes from the model rather than from memory.
The advantage: a quote and a material list you can send the same day.